We design it with you, pull the permits, and build it with our own team. Most bathrooms are finished in 2 to 4 weeks.
4 quick taps. Takes about 30 seconds.
What are you hoping to do?
Which bathroom is it?
When would you like to start?
Do you own the home?
Where should we send your visit details?
Remodels need the homeowner's go-ahead, so we'd love to hear from your landlord. Feel free to pass along our number.
Call (206) 333-2370We'll call you shortly to pick a time for your free design visit.
Can't wait? Call nowThat's exactly why we start with a design visit, not a sales pitch. You'll know what it looks like, what it costs, and how long it takes before anyone picks up a hammer.
Every photo here is a bathroom our team designed and built.





We come to your home, measure, and talk through how you actually use the room. Bring your Pinterest saves. We'll bring ideas.
You get a clear layout, material options, and one fixed price in writing. Take your time deciding. No pressure.
Our team handles demo, permits, plumbing, tile and cleanup. Most bathrooms are done in 2 to 4 weeks.

New layout, tile, fixtures, lighting. Down to the studs if it needs it.

Swap the tub nobody uses for a walk-in shower. One of our most popular jobs.

Double sinks, quartz tops and storage that fits your things.

Waterproof flooring, custom tile and built-in shower niches.
It depends on the size of the room, the layout and the materials you pick. A powder room refresh and a full primary bath are very different projects. That's why we measure first and give you one fixed price in writing, so the number you agree to is the number you pay.
Most bathrooms take 2 to 4 weeks. Moving plumbing or special-order tile can add time, and we'll tell you the schedule up front.
Plumbing, electrical and structural changes need city permits. We handle the applications and inspections for you.
Yes. Tub-to-shower conversions are one of our most requested projects.
We look at the space, take measurements, and talk about what bugs you and what you'd love. It usually takes about an hour. You're under no obligation to move forward.
Yes. Book your free design visit through this page and it comes off your remodel price.
Book a free design visit, get one clear price, and take $1,000 off. If it's not the right time, no hard feelings.